Inauguration of NNTP LAN Project By CGM NLC India Limited

New Thermal power plant, NLC India Limited, awarded an order for a value of INR 71 lakhs to establish of Computer LAN at service building, AO Building, Common control room, Switchyard, Main LHS Control room, WCTP building, Time office, Stores, and interconnecting them to Server at Service building of NNTPP on 18.8.2020.

Despite the pandemic situation, the supply installation and commissioning were completed well within the stipulated project period. VLINK thanks the Partner MOLEX and ALLIED Telesys for timely delivery of the Cables and Switches despite the Pandemic.

The project was inaugurated by CGM, NLC India Limited on 28.10.2020.

The EPABX system, UHF communication system, Public Address system, CCTV system in NNTP NLC India Limited are already installed by VLINK and are in the Maintenance care of VLINK.

Proud Moment for the VLINK Team

NNTP, NLC India Limited CGM Mr.Raghuraman performing Pooja for inauguration of the NNTP LAN Network on 28.10.2020